RECRUITMENT PROCESS

How to apply:

Please submit your technical and financial proposals demonstrating ability to deliver this assignment based on qualifications and professional experience. Detailed proposals should be emailed to [email protected]  with subject line “Design Engineer for civil works at Bhag Nari, Balochistan” mentioned in the subject line of the e-mail.

Deadline for submission of proposals

Apply by August 30, 2021

Link:

https://www.rozee.pk/r5fiM

STRENGTHENING PARTICIPATORY ORGANZATION (SPO) REGIONAL CENTER QUETTA IN COLLABORIATION WITH META-META RESEARCH

 

ToRs for Recruitment of design Engineer for civil works at Bhag Nari Balochistan

Preamble

Strengthening Participatory Organization (SPO) is development sector private Company who is engaged in the field of Education, Health, Livelihoods and Irrigation Water Management. The company has received a small funding from RVO, a subsidiary organization of Ministry of Economic Affairs Government of Netherlands under the public and private partnership basis. Government of Balochistan through irrigation department. In this regards an MoU was signed in July 2020.

The project name is “New Water Rights in Basin Management” Inclusivity in Spate Irrigated areas of Pakistan. Part of the project is under implementation in Kacho area of District Dadu Sindh in association with Sindh Irrigation and Drainage authority.

The remaining part half of intended Funds are required to be spent on spate irrigation systems in Bhag Nari area (Bala Nari and Zerena Nari) in Tehsil Bhag, district Bolan Balochistan. This TORs only covers the civil works at various canals along the Nari River e.g. spending on improvement of at canals and at farm gate irrigation water delivery. The package of improvement includes improvement and rehabilitation of flood canals, drinking water ponds, at field inlet/outlet structures.

The scope of work is already identified through the local PMCs members from different canal who will be benefited from Nari River as per following detail:

  • Rehabilitation of Mahram canal-6000ft
  • Rehabilitation of Musa Wah 6000ft
  • Rehabilitation of Khatoor channel at Fatwani 6000ft
  • Rehabilitation of Pir Taqi Nalla 6000ft
  • De-silting of 12 drinking water ponds at different locations
  • 50 at field water management structures
  • Gully Plugging, guide bund and rehabilitation of tertiary canals upto 15000ft at Sounwah
  • Raising of Existing Guide Bund and Construction of New Regulator at Rehanzai

For the purpose an engineering firm/professional services are desired for quantity calculation necessary drawings, cost estimates and site plans in line with Balochistan Irrigation Department Schedule Rates 2018.

The incumbent is required to undertake the following task before the commencement of the work.

Task Essentiality

  • Undertake field survey and measure the scope work at each canals and system given in serial number 1-8.
  • Devise the cost estimate against each item/component
  • Prepare a final PC-1 and site plan for the scheme 1-6 and PC-1 for the system given at serial 7 & 8 will be prepared separately being a complex engineering work.
  • Time period for the task is 45 days from the date of signing of the mutual agreement after selection.
  • For the field surveys this office will provide close coordination of local farmers through their PMC/FO members. Estimated time for field surveys is about 15 days.
  • This office can also provide the transport while commuting from Bhag office to different sites.

Payments of fee

Payment for the task will be made in 3 installments of the agreed consultancy cost (i) 40% advance giving in writing (ii) second installment will be released once the draft PC-1 is finalized and 20% and final payment shall be made after submission of final PC-1 and relevant papers.

Legal deduction in term of taxes on the consultancy cost will be applicable and dedicated as per the rates fixed by the government of Balochistan or Federal Board of Revenue.